At the junction of different materials (masonry and reinforced concrete beams and columns) of the thermal insulation decoration integration, it is advisable to add a metal mesh in the leveling layer, and the width of the mesh is 200-300 mm. Residential buildings above 9 floors, public buildings above 24M, or some exterior walls with high waterproofing requirements should be affixed with metal mesh.
The thermal insulation decoration integration has a complete closed-cell structure, and there are no gaps on the front and back sides of the board, so the moisture generated by leakage, condensation, water freezing, thawing cycles, etc. will not penetrate, effectively preventing water molecules from entering, and will not age, and the service life is almost the same as the building. The thermal insulation decoration integration has good thermal insulation performance. In addition, the anchoring method, joint treatment and cold bridge design of the patented product reduce energy-saving losses. Therefore, especially in areas with harsh climates, such as the Northeast and Northwest, there are requirements for energy saving and thermal insulation.
Although some exterior wall thermal insulation decoration integrated panels have a good appearance, they are short in service life due to poor material selection, and are prone to quality problems after installation. The sales price of such panels is generally not very high, although it can save some expenses for the construction party.
The color of the integrated insulation decoration is dark gray and light gray. The dark gray is used for the overall facade and the light gray is used for the structural lines, thus forming a sense of hierarchy. The panel layer of the integrated board is a metal fluorocarbon exterior wall decoration effect with a thickness of 8mm. The insulation layer uses a 25mm rock wool insulation board, which is waterproof, etc. The construction is generally carried out in a bottom-up construction sequence, but in order to ensure that each board is on the same horizontal line on the surrounding walls, it should not be pasted in the order of starting from the same baseline of the surrounding walls of the building and then pasted in two directions upward.