Company NewsABOUT US
Residential and office buildings need to be equipped with integrated exterior wall insulation and decoration
2022-04-16

Residential and office buildings need to be equipped with integrated exterior wall insulation and decoration. External insulation or sandwich insulation should be done as much as possible. The higher the insulation performance index, the better. However, there is no need to copy the airport terminal in this area because the terminal building has a large spatial scale and a lightweight transparent part in the enclosure structure. Before a building is completed, a mortar will be applied to the outside of its wall. In the construction industry, this mortar is called insulation mortar. As the name suggests, its main function is to be used for insulation. Now many construction industries will stop construction during the winter season.

居住办公类建筑需设置外墙保温装饰一体化

Residential and office buildings need to be equipped with integrated exterior wall insulation and decoration


The integrated exterior wall insulation and decoration is a self-extinguishing molded (foamed) polystyrene foam board with a thickness of 60mm and a bulk density of 18Kg/m3. The external insulation board is inspected and accepted on site and can only be used after the project technology, quality inspection, Party A, and supervision agree. The performance indicators of the insulation board must meet the requirements.


Characteristics and advantages of the integrated insulation decoration board of the manufacturer of the integrated exterior wall insulation and decoration: convenient installation and cost saving. The new thermal insulation decorative board is light in weight and small in size, which saves time and effort in transportation and installation. The installation method is simple and fast, and is not affected by factors such as season and climate.


The basic factor of the building's exterior wall thermal insulation and decoration integration is very relevant, because the exterior wall insulation system will directly determine the basic thermal insulation performance and safety performance of your office building. However, the construction speed is slow, the single-point hanging ability is weak, and the construction management level is required to be high, which is not considered an assembled method.