1. Due to the wall not reaching the required level, it is necessary to first grind and paste the insulation and decoration integrated board (such as EPS board) to ensure the flatness of the wall, and then perform a second polishing before the benzene board is firmly attached. After hanging the net, it should be adhered smoothly.
The gap between the integrated insulation and decoration board must be filled with half a strip. The strip cannot be bonded, let alone filled with adhesive.
3. The internal and external corners and outer wall surfaces do not need to be vertical, but they must be straight and have no obvious bending angles.
4. The integrated insulation and decoration board for the corners of doors and windows should be cut from the entire polystyrene board and should not be spliced together.
After the completion of the insulation and decoration integrated board, it should be left to stand for at least 24 hours before grinding to prevent the polystyrene board from moving and weakening the bonding strength between the board and the basement wall.
6. Who is responsible for implementing the safety, quality, and schedule management system for construction.
7. Grid layout for reinforcing doors and windows
8. The top of the window is used as a drip line, and the bottom of the window is used as a slope water. The drainage holes at the bottom of the window frame should not be blocked to ensure proper drainage.